Electrician in Santa Monica, CA: Fast Callbacks and Clear Starting Prices
Request a quote
Santa Monica jobs start fast and start with a price: a breaker fix from $100, a panel upgrade from $800 and EV charger labor from $750. Rush Electrical Service is a licensed and insured company. Our phone line is staffed 24/7, and we aim to call you back within three minutes after you send the form.
Many Santa Monica calls we hear about come from condos and small multi-unit buildings: a garage outlet, a unit that lost power, a charger that needs the building’s supply. The sections below cover what to do first, what it costs and how we scope the job. Outside Santa Monica? See our full list of service areas.
Licensed and insured
The company is licensed and insured; our electricians are licensed
Call center 24/7
A live person answers right away
Callback in three minutes
Our target after you send the form
Same-day appointments available
Depending on who is free
Google rating 4.8 to 5
Across our four Google listings
What should I do first if something sparked or the power is out in Santa Monica?
Step away from the spot first, and call 911 if you see flames or heavy smoke. If it was only a spark, a burning smell or a dead unit, switch off the affected breaker when you can reach it safely, then call us.
Someone is on our phone line around the clock, and visit times are flexible. After-hours labor starts at $150 per hour, an entry rate and not the cost of a full repair. We often have same-day appointments, depending on which electricians are free.
- Do not keep resetting a breaker that trips again straight away
- Do not touch an outlet or panel cover that is hot, discolored or buzzing
- Tell us if the whole building lost power, since the cause may sit outside your unit
How fast can we get to you in Santa Monica?
When you call, a person answers right away. If you send the form instead, we aim to call you back within three minutes. You are then offered a visit slot and a price estimate, and you choose.
Our Santa Monica profile also covers Culver City, Beverly Hills, Brentwood, Venice, Marina Del Rey, Westwood, Playa Vista, West Los Angeles and Pacific Palisades. Read out your address and the call center will tell you which visit window fits.
- Culver City
- Beverly Hills
- Brentwood
- Venice
- Marina Del Rey
- Westwood
- Playa Vista
- West Los Angeles
- Pacific Palisades
Who is Rush Electrical Service in Santa Monica?
Rush Electrical Service holds a license and carries insurance. In Santa Monica we handle outlets and switches, light fixtures, panel repair and upgrades, power restoration and EV chargers.
A licensed electrician makes the visit, explains the cause in plain words and quotes the price before any work begins.
How much will an electrician cost me in Santa Monica?
Is a Santa Monica charger job a few hundred dollars or a few thousand? Every price below is a starting point. Your cost may differ.
Job
From
What the starting price covers
Electrical visit
$100 per visit
Covers roughly the first hour on site; parts are extra
Circuit breaker replacement or repair
$100 per job
A single standard breaker swap or a simple breaker related fix
Electrical panel upgrade or replacement
$800 per job
A simple 100-amp swap; a standard 200-amp upgrade starts near $1,300
EV charger installation
$750, labor only
Basic home Level 2 install; around $1,200 once charger and materials are added
Outlet installation
$150 per outlet
One new standard 120V outlet on a short, reachable wiring run
Emergency electrician
$150 per hour
An entry after-hours labor rate, not the price of a full repair
What moves the price in a condo or small building
- How far the circuit runs from the panel to the parking space
- Whether the shared panel has room for the new load
- Whether the permit scope covers new wiring as well as the charger
- What the electrician finds at the survey
What happens after I call or send the form?
1
Call us, or send the form. Calls are answered right away, 24/7.
2
We call you back. After a form, our target is three minutes.
3
You book a time. The call center offers a visit slot and a price estimate for the job.
4
A licensed electrician arrives, inspects and explains the cause.
5
The work happens that visit if you accept, or later at a time you choose.
Is my Santa Monica job a free quote or a diagnostic visit?
A free quote fits a defined, bigger job. A diagnostic visit fits a fault nobody has traced yet, and its charge varies, usually landing under $50.
Your Santa Monica job
How it starts
What happens next
EV charger in a condo garage or building lot
- Free quote
Tell us the charger and the parking space; the electrician checks the supply and writes the charger and any upgrade as separate scopes
Panel upgrade or panel installation
- Free quote
You get an estimate by phone; the price is confirmed once the electrician sees the panel
Breaker that trips or will not reset
Diagnostic visit
Cause first. Breaker replacement becomes a free-quote job once the cause is known
One unit or one room lost power
Diagnostic visit
The electrician finds whether the fault is in the unit, in a shared panel or in the supply
Doorbell, chime or small low-voltage fault
Diagnostic visit
Traced first, then priced
Six jobs we book in Santa Monica, each with its own page:
A new panel when the old one is full or outdated. Free quote.
A breaker that trips, buzzes or will not reset. Free quote for replacement.
Old or damaged wiring replaced room by room or across the house. Free quote.
What jobs have we handled in Santa Monica?
Three Santa Monica jobs, shown as problem, finding, fix and result.
Job 01
Charger job with a hidden upgrade
Problem
A charging project also needed new distribution, but the application described only the wall unit.
What we found
The permit scope did not match the full work.
What we did
We separated the charger scope from the upgrade scope.
- Result
The review matched the full installation.
Job 02
Doorbell that never stopped
Problem
A flat’s doorbell buzzed continuously.
What we found
A crushed button wire was holding the circuit closed.
What we did
We repaired the low-voltage circuit.
- Result
The chime stopped once the button was released.
Job 03
Storage room light that would not switch
Problem
A storage room light failed.
What we found
The pull switch chain had jammed inside the switch.
What we did
We replaced the control.
- Result
The lighting responded normally.
In Santa Monica, charger work can involve a separate electrical upgrade. The application described only the wall unit, so we separated charger and upgrade scopes. We define both parts at the survey so the permit scope matches the installation.
Our electrician from Santa Monica
- Tip
Ask for any change to the building’s distribution to be written into the scope from the start.
What does Santa Monica's EV charger rule mean for my building?
The City of Santa Monica adopted an EV charger reach code in 2022, an amendment to CALGreen. Its press release says it requires new projects to add EV charging spaces, from January 1, 2023.
For new multifamily buildings of three or more units, the City says 60% of parking spaces must be EV Ready, 5% must have chargers installed during construction, and another 10% must have electrical capacity for future chargers.
Existing buildings
That rule is written for new projects. In an existing condo or small building we ask other questions first: which panel feeds the garage, how much spare capacity it has, and who has to approve work in a shared space. Source: City of Santa Monica press release on the zero emission building code and EV charger reach code.
Is Rush Electrical Service licensed and insured in Santa Monica?
Yes. The company is licensed and insured, and the person who visits is a licensed electrician. You hear the cause and the price before work begins.
Which cities near Santa Monica do we also serve?
Our Santa Monica profile lists Culver City, Beverly Hills, Brentwood, Venice, Marina Del Rey, Westwood, Playa Vista, West Los Angeles and Pacific Palisades. For other Southern California cities, start here:
What do Santa Monica customers ask before they book?
Can you add an outlet in a condo garage?
Often yes, and a new outlet with a short, accessible wiring run starts at $150. A shared garage usually needs the building’s permission, so check that first. The electrician then looks at which nearby circuit can carry it and how the cable can run.
One unit in my building lost power. Who fixes it?
The electrician first finds where the fault sits: inside your unit, in a shared panel or in the supply to the building. That decides who has to approve the repair. Tell the call center whether you own or rent when you call.
Can someone come today?
Same-day visits are often possible, depending on who is free. Call and ask for the earliest slot; you hear the time before you commit.
I saw sparks. Is that a fire risk?
Treat sparks as a warning. Stay away from the spot, switch off the breaker if it is safe, and call 911 if you see flames or smoke. Then call us so an electrician can find the cause.
Do you cover Santa Monica and the neighborhoods around it?
Yes. Our Santa Monica profile lists Culver City, Beverly Hills, Brentwood, Venice, Marina Del Rey, Westwood, Playa Vista, West Los Angeles and Pacific Palisades.
Is this the same company as another listing I found?
The name on this Santa Monica Google profile is Rush Electrical Service, with the phone number (310) 388-3982. Our Burbank profile is named Rush Electrical Service Burbank.
Where is Rush Electrical Service Santa Monica on the map?
Rush Electrical Service
Address
719 Santa Monica Blvd #453, Santa Monica, CA 90401
Phone
Google rating
5 from 68 reviews
Service area
Culver City, Santa Monica, Beverly Hills, Brentwood, Venice, Marina Del Rey, Westwood, Playa Vista, West Los Angeles, Pacific Palisades
- Google review
Five-star service all the way! A friend recommended this company for my EV charger installation, and I’m so glad they did. The electrician was friendly, meticulous, and completed the job to perfection.
S4ntaro
a year ago
- Google review
They really came through. The electrician fixed my tripping circuit breaker quickly and efficiently. He had it all sorted in under an hour. I am glad I reached out when I did. Very impressed.
Hassim Usman
a year ago
- Google review
I’m so glad I chose this company for my electrical panels upgrade. They arrived on time, worked efficiently, and made sure everything was done safely and correctly. My home’s electrical system feels so much more reliable now!
Rachelle Cacayan
a year ago